Using Excel (Power Pivot, Power Query and Macros) to generate indicators to evaluate the progress of each project, comparing established resources against those consumed.
Evaluation of my daily activities and those of my team. Subsequently, automate and optimize activities that allow it: facilitating the data loading interface in order to reduce errors, establishing cross-checks to detect possible human errors in data loading.
Project management: establishing resources (work hours, positions, tools, materials), generating a work breakdown structure (WBS), project tracking, identifying deviations, and evaluating how to proceed in each case. Provide technical advice to supervisors and operators.
Evaluate customer needs to determine a manufacturing strategy that optimizes resources and costs, proposing design changes, when possible, to improve the economic proposal without affecting the requirements.
Generate work networks intercompany to optimize information exchange, saving processing time and reducing errors due to excessive data loading.